- Home Page /
- Office Products /
- Office & School Supplies /
- Calendar Planner & Organizer Books /
- Planning Pads /
- Tops Project Planning Pads 40 Sheets per Pad,...
Tops Project Planning Pads 40 Sheets per Pad, 4 Pads per Pack
87% of respondents would recommend this to a friend
SRD 794
Price Details
Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )
*All items will import from US
QTY:
Ubuy works hard to protect your security and privacy. Our advanced payment security system ensures confidentiality by encrypting your information during transmission using AES (Advanced Encryption Standards) and SSL (Secure Socket Layer) protocols. Your payment details are 100% secure as we do not share your payment details with third party sellers.
Unique layouts aid planning, design and communication
Fast
Shipping
Free
Return*
Secure Packaging
100% Original Products
PCI DSS Compliance
ISO 27001 Certified
What Stands Out
Product Details
- TOPS Project Planning Pads
- Each pad contains 40 sheets
- Includes 4 pads per pack
- Unique layouts assist in planning, design, and communication
- Wide margin for additional notes
- Grid ruling on the back
| Brand Name | Tops |
| Unit Count | 160 Count |
| Global Trade Identification Number | 00025932771026 |
| UPC | 025932771026 |
| Item Weight | 2.4 pounds (1.09 kg) |
| Cover Material | Paper |
| Paper Size | 8.5-x-11.75-inch |
| Pages | 80 |
| Item Dimensions L x W x Thickness | 11.75"L x 8.5"W x 1"Th |
| Number of Items | 1 |
| Color | White |
| Theme | Book |
| Style | Legal/Wide |
| Ruling Type | Project |
| Special Feature | Soft Cover |
| Specific Uses For Product | Project Planning, Task Management |
| Binding | Office Product |
| Brand | Tops |
| Sheet Size | 8.5-x-11.75-inch |
| Product Dimensions (L x W x H) | 11.75"L x 8.5"W x 1"Th (29.8 x 21.6 x 2.5 cm) |
Product Description
Tops Project Planning Pads 40 Sheets per Pad, 4 Pads per Pack
Customer Questions & Answers
-
Question:
How to Shop Tops Project Planning Pads 40 Sheets per Pad, 4 Pads Online From Ubuy?
Answer: It’s easy to shop Tops Project Planning Pads 40 Sheets per Pad, 4 Pads online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location. -
Question:
Is Tops Project Planning Pads 40 Sheets per Pad, 4 Pads Available to Shop Online in Suriname?
Answer: Yes, at Ubuy Suriname this product is available for you to shop at a reasonable price. The Tops Project Planning Pads 40 Sheets per Pad, 4 Pads is not available locally but you can trust us with our express shipping services. -
Question:
How Long Does It Take to Get Product After Placing the Order?
Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.
Tops Planning Pads Editorial Review
Customer Reviews & Ratings
-
5 Star
100%
-
4 Star
0%
-
3 Star
0%
-
2 Star
0%
-
1 Star
0%
Review this product
Share your thoughts with other customers
Product Price History
Important information
- Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
- Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.
SRD 794
Order now and get it around Sunday, October 11
This item is not restrict in my country.(Please click on above link if this item is not restrict in your country, So our team will review and allow.)
QTY:
PCI DSS compliant and ISO 27001:2022 certified, with encrypted payments and full buyer protection on every order.
Features & Benefits
- Wide-margin planning pad is ideal for project notes and reminders
- Faintly printed horizontal rules reduce visual distraction and produce cleaner photocopies
- Contains 40 stitched sheets of 20 lb. white bond sheets
- Letr-Trim perforations allow clean and easy sheet removal
- Heavyweight paper prevents bleed-through to next sheet
- Grid ruling on back
Ubuy Assurance
Experience worry-free shopping with 100% original products, PCI DSS-compliant payment security, ISO 27001-certified data protection, the fastest cross-border delivery, free returns *, and secure packaging on every order.